Installation

 

Due to the modular design of the mineral processing project, the installation on site has become simpler, safer, more efficient and of higher quality. Every step of the installation has strict schedules, operating procedures and inspection standards to ensure the best performance of the equipment performance and beneficiation process.

Since all equipment and main auxiliary facilities are manufactured in the factory and transported by container, the installation on site is basically simple and easy to connect, in addition to the large-sized tank welding, the installation of lifting, electricity, consumables, manpower cost is greatly reduced, and can be completed in a short period of time, so that customers get project benefits as early as possible.